OEE software for a small manufacturer is often a factory OS wearing a ratio. Scheduling, maintenance, quality, HR. You wanted three numbers.
Availability × performance × quality. If any of those is a guess, the score is theater. You will hear “world class near 85%” and “most plants sit lower.” Ignore the poster until your three inputs are honest.
Availability
Planned time minus unplanned stops. You need run/idle and a short reason list. Write planned time down: shifts you staffed, breaks you actually take, maintenance you scheduled. If that sentence is fuzzy, every meeting is a definition fight.
Performance
Ideal cycle versus actual. If you do not have an ideal cycle for the part, skip this number for a while. A lot of shops should run availability and scrap for months first. Micro-stops hide here — the mill is “running” and still not making the rate. Standing at the cell beats a performance module.
Quality
Scrap plus the pieces that ran twice. If a part ate a second cycle, that is not 100%. Otherwise OEE congratulates you for making it twice.
One page a week
Three numbers, the largest loss, one action. If you cannot leave with a CSV, you are renting the score. If you need those numbers in the same app as jobs, that is a small system with an owner — not a 40-module suite.
A page that earns the meeting
Availability 62% on the bottleneck, because changeover and a walk to inspection ate the shift. Performance left blank — they do not have an ideal cycle for this family yet, and a made-up rate would have flattered them. Quality 96% only after they counted the parts that ran twice; the first version had said 100% and congratulated them for the recut.
Largest loss: changeover. One action: stage the next fixture before the spindle stops, and write last-good-chip to first-good-chip on the traveler. Next week’s page either moves or they admit the action did not happen. That is OEE for a small plant. The suite can wait until this page has been true for a month.
This week
- 01
Write planned time in one sentence
Shifts you staffed, breaks you actually take, maintenance you scheduled. If that sentence is fuzzy, every OEE meeting will be a definition fight.
- 02
Start with availability and scrap
Add performance only when you have an ideal cycle for the part. A lot of shops should ignore the middle number for a few months.
- 03
Publish one page a week
Three numbers, the largest loss, one action. If you leave with a debate and no action, the page is a score, not a management tool.
- 04
Keep a CSV
If the ratio dies when the subscription does, you rented a picture. The weekly page has to be exportable.
Common mistakes
Buying a suite to get a ratio
MES is orders, inventory, genealogy. You wanted availability, performance, and quality. Three numbers do not require a factory operating system.
Comparing a job shop to 85%
High-mix changeover is real. Compare this month to last month on the same machine. A textbook line is not your moral standard.
Key takeaways
- OEE is three inputs. If any input is a guess, the score is theater.
- Availability and scrap are enough until you have an ideal cycle.
- One weekly page with a largest loss and one action. Leave with the file.
If you already have two weeks of stops on paper and you want a log the shop can keep, send that list. If you do not have the list, that is the work — not a quote for another mill.
Questions
- Do we need MES to do OEE?
- No. Three numbers and a weekly page. MES is orders, inventory, genealogy. Do not buy it to get a ratio. Buy it when you need those other jobs and you already trust the three numbers.
- Is 85% realistic for a job shop?
- Often no, and that is not a moral failure. High-mix changeover is real. Compare this month to last month on the same machine, not to a continuous line in a textbook.
Offers
SINLETechnologies LLCSINLE Technologies LLC
SINLE Technologies LLC takes stuck jobs and turns them into technology people keep using. The company decides which work it takes, and the direction of every division.