You said you need capacity. The vendor said you need more data. Capacity is a calendar. Utilization is whether the machines you already have were busy inside it.

The ratio

Run hours divided by planned hours. Planned time is shifts you staffed — not Sunday if nobody was there. Optional: take planned maintenance out so a rebuild does not look like failure. If a product needs twelve settings to show that, it is hiding the number.

Idle is not one thing

No job in queue is sales and scheduling. Waiting on tools is the crib. Waiting on inspection is layout. Software that cannot take a reason will tell you the mill was idle. You already knew that.

A table is enough

Two weeks on the bottleneck, same shifts, with reasons. That can cancel a machine PO or justify one. Color is for slides. If you cannot export the history, you do not have utilization. You have last month’s picture on a subscription.

The table that stops a purchase

Planned hours on the queued mill: 70, two shifts, breaks out. Run hours: 41. Idle: 29. Of those, 16 were “no job in front of it,” 9 were inspection, 4 were a missing tool. The crash everyone remembers was under an hour and already has a photo.

A new mill does not fill a queue that is empty, and it does not move inspection closer to the cell. The purchase waits. The next two weeks go to the 16 and the 9: how dates are promised, and where first-article sits. If a later table shows the same mill honestly busy and the queue still real, then you price iron. Until then the software you need is a column for the reason, not a heatmap.

This week

  1. 01

    Pick the bottleneck and the shifts you actually staff

    Sunday does not count if nobody was there. Write planned hours before you write a ratio.

  2. 02

    Log run, idle, and a reason for two weeks

    No job, waiting on tools, waiting on inspection, breakdown. Four reasons are enough. Twelve will become “other.”

  3. 03

    Read the table before any purchase order

    Idle because the queue is empty is sales. Idle because a tool is missing is the crib. A heatmap will not tell you which.

  4. 04

    Keep the history when you leave the tool

    If you cannot export the two weeks, you rented a picture. A machine decision needs the file.

Common mistakes

  • Treating every idle minute as a reason to buy iron

    A mill at 50% because it waits on inspection will be a second mill at 50%, plus the payment. Fix the wait, then measure again.

  • Hiding the ratio behind settings

    Run hours over planned hours. Optional: take a rebuild you scheduled out of the denominator. If the product needs a workshop to show that fraction, it is hiding the number.

Key takeaways

  • Utilization is run time over the hours you staffed. It is a capacity question, not a dashboard question.
  • Idle needs a reason or it cannot change a purchase.
  • Two honest weeks on the bottleneck can cancel a machine or justify one.

If you already have two weeks of stops on paper and you want a log the shop can keep, send that list. If you do not have the list, that is the work — not a quote for another mill.

Questions

Is this the same as OEE?
Mostly availability. OEE also folds rate and quality. For a machine purchase, start with utilization and a reason code. Add the other two numbers when the first one is believed.
What utilization is “good”?
Compare this month to last month on the same machine and the same shifts. A job shop will not look like a continuous line, and it does not need to. The useful question is whether the idle has a cause you can remove.