Skip to content

GuidesHow to2 min

How to replace the change-order paper trail with an agent

A site text and a photo become a priced change order, sent the same day, from your rate card. Unsigned work stops being a job someone reconstructs on Friday.

Contractors do not lose money in the estimate. They lose it in the change that was agreed beside the truck and never written down. The agent writes it, prices it from the card, and sends it. The owner’s night at the kitchen table is the workforce this removes.

The sequence

Do these in order. Skip a line and you are back to a workshop.

  1. 01

    Price the leaks

    Changes agreed on site and never billed. That cash is the clerk you do not have — the owner, at night, trying to remember.

  2. 02

    The agent writes the change the day it happens

    Text, photo, job number. Scope and price come from the rate card and the markup you set. It goes to the client the same day.

  3. 03

    The client signs on the page

    Name, time, the exact amount. A “sounds good” in the group text is copied onto the record, and the page is what you bill.

  4. 04

    Budget moves when it is signed, not when someone remembers

    Pending and committed are different. The agent puts the signed amount on the job. Bookkeeping stops guessing which invoice belongs where.

  5. 05

    Daily logs file themselves

    The lead posts photos and a line. The agent attaches them to the day. Nobody assembles a folder at closeout.

  6. 06

    The owner stops being the system

    If the owner is still the person who writes changes at 9 p.m., the agent is not live. Take that hour off the week on purpose.

Common mistakes

  • Holding every draft for the owner to retype

    Then the owner is still the clerk. They set the rate card once. The agent applies it.

  • Pricing from a photo with no rate card

    The agent prices lines you defined. It does not guess board-feet. A missing rate is an exception, not a hallucination you bill.

Keep these

  • The cost you cut is unbilled changes plus the evening the owner spends reconstructing them.
  • Estimating and QuickBooks stay. The middle — the text that never became money — is what the agent replaces.

If you want this seat gone: name the job in one sentence. You get a written scope — what the agent does unattended, and the few acts the law still keeps with a person — or a written no. Nothing is billed before you approve the page.

Questions

Is the signature still the client’s?
Yes. The agent prepares and sends. The client signs. What disappears is the employee — often the owner — who used to write it up late or not at all.
Can it bill QuickBooks?
Signed changes and job costs export with the job number. The bookkeeper posts. They stop hunting the thread.
All guides

Next

Name the job a person still does by hand.

We scope the agent that does it instead. Hours and the salary line are the result, not a dashboard.